frequently asked questions |
|
|
|
01
Should we
renovate, build a new house or just move? |
|
|
|
|
|
 |
|
It depends on
several factors. Generally, our advice is to choose a
neighbourhood you love and house close to what you want (because
you’ll never find the house that matches your needs exactly),
that way the
necessary renovations may be smaller.
Another factor
is the age and condition of your home. Does it have the “bones”
to sustain the contemplated work, or will it need extensive
upgrades just to get to the starting line?
Are there
sentimental things you enjoy about your home that you would like
to keep or recreate in a new house?
When building a
new house in British Columbia, you get the added security of the
New Home Warranty (HPO) and the predictability of new
construction (in terms of schedule and budget).
As every situation is
different, please call our office to book a consultation in
your home. |
|
 |
|
|
02
Will an architect be interested in my small project? |
|
|
|
We
realize that it may seem difficult to approach an architect for smaller
projects. At
HEARTH architectural, our goal is to easily allow you to utilize the
services of an architect without pretense. If you will benefit from a new kitchen opened to a family
room, or a simple addition, we would like to help you. |
|
 |
|
|
03
Why should we use an architect? Why not a drafting service (or
“my cousin’s friend who likes to draw”…)? |
|
|
|
Architects undergo extensive education and on the job training before
they can even call themselves architects. Architects are bound by
bylaws specific to their profession and must adhere to a strict code of
conduct in serving the pubic. By law, they are required to serve your
best interests.
In
their training architects look specifically at built space and how they
interact with and affect peoples’ daily lives. Combine this with
extensive, current building technology knowledge, experience with
municipalities, other design professionals such as engineers and an
intimate knowledge of the process of design and construction, and an
architect is a clear, accountable choice.
Whether renovating or building new, money spent on your home is one of
the largest investments you may undertake. The risks to your investment
are high when dealing with the costs of construction
and it is always best to consult with professionals who deal with the issues on a
daily basis. |
|
 |
|
|
04
Can we use stock plans for our new home? |
|
|
|
Stock plans may be a useful starting point; however, they are also very
limited. In order to use them, they must be adapted to conform with
site specifics, local zoning bylaws, and local
building codes.
Stock plans, while enticing, have no relationship to your building site.
In general they are designed for “any” site. This means that any
particular attributes of your site such as micro-climate, view, orientation,
geographical characteristics, are not taken into account.
Stock plans also have insufficient information for securing municipal
building permits or accurate
pricing from builders.
While stock plans might be a good starting point for discussion, in
the end, the money spent on stock plans at the early stage may be better spent with an architect looking at your specific situation. |
|
 |
|
|
05
Isn’t an architect too expensive? |
|
|
|
Architect fees reflect the time it would take to do a particular job
with the due diligence and care required to perform it responsibly.
Architects in BC must comply substantially with the Tariff of Fees
issued by the Architectural Institute of BC (AIBC) to ensure a level playing
field and to avoid fee under-cutting. An architect may either work on a
percentage based fee (normally referred to as a fixed fee) or hourly.
An architect is required to charge for any advice that is dispensed.
In
the end the money put into professional services is reaped in your
satisfaction in the custom design of your home, the reduction of your
stress during the design and construction phases, and the increased
value that an architect designed home has in the real estate market. An
architect can even approach your project from the beginning with a view
to designing to maximize your “bang for your buck”.
In
general terms, people can tell if something is well designed and
engaging an architect can add this value.
At HEARTH architectural, we understand
that committing to professional fees is a big decision, and is usually
not made based on anything more that an interview, references and
samples of work.
We have really strived to break down
the process so it is clear to you from the beginning what service you
will be receiving, but also to ease you into the commitment. We
have developed an incremental approach to the initial design work.
Please click our "Process" button above to learn more about our unique
project delivery/service model. |
|
 |
|
|
06
Can we add a second storey? |
|
|
|
It
depends on the municipal bylaws that apply to you and the structural
integrity of your home. Both of these would have to be investigated
first.
Please contact the HEARTH
architectural office for more information or to book a consultation in
your home. |
|
 |
|
|
07
Do we need a building permit? |
|
|
|
Most municipalities require a building permit if you are
performing work that requires a city inspection. This type of work may
include any structural, electrical, or plumbing changes. Certain
municipalities even require repair and maintenance permits for smaller
projects. It is best to contact
our office or your city hall directly. |
|
 |
|
|
08
How can we find a good builder? |
|
|
|
We
at HEARTH architectural have worked with many different builders in the
Metro Vancouver area. We are able to pre-screen builders by location
preference, scale-of-job preference, and compatibility with our clients.
Generally, we only deal with builders we have established a rapport with
and who have demonstrated their abilities at effective project
management by delivering quality - on time and on budget.
We
can help you negotiate with a particular builder or work through a
competitive bid process. |
|
 |
|
|
09
We only want building permit drawings. Can you help us?
or
Who looks after our interests during construction? |
|
|
|
At
HEARTH architectural, we pride ourselves in providing full service and
believe that the most important time for our involvement is during
construction. This is when all of your wishes and design solutions are
implemented.
During construction we act as the administrator of your contract with
the builder. We are there to facilitate. We answer questions that
arise during construction, as well as process builders’ claim for
payments, to ensure that not only do you get what you pay for, but that
the quality and craftsmanship is also delivered.
That being said, if we feel that a
particular client has the experience or training required to work in
their own best interests during construction, we would be happy to
discuss modifications to our standard service. |
|
 |
|
|
|
|
Some municipalities allow suites. If yours does, it is simply a matter
of reviewing the particular rules within your city and working within
them. Most times, it is possible to integrate a suite into your home.
Please call us for more information, or contact your municipality
directly. |
|
 |
|
|
11
Is this wall load-bearing? (Can we open up a wall?) |
|
|
|
Often times in renovations you are only limited by your imagination, and
structural elements can often be addressed with clever architectural and
engineering design solutions.
As
with any endeavour there are always ramifications, and you would want to
make sure you are fully aware of potential problems and costs. We can
help you identify these things, before the big money is spent. For
more help, please feel free to contact our office for a consultation in
your home. |
|
 |
|
|
12
Do you carry liability insurance? |
|
|
|
In
British Columbia, liability insurance for architects has become
increasingly difficult, if not impossible to get, for newer firms. This
means that many design professionals are forced to risk practicing
without liability insurance.
HEARTH architectural has, through the solid record of its principals,
been able to secure and maintain professional liability insurance for
the benefit and security of all. |
|
 |
|
|
13
How long does the design process take? |
|
|
|
The
design process is contingent on many factors. The complexity of the
project, the scale of the project and any special or discretionary
processes or requirements by municipalities that must be met all effect
the timeline.
A
project might be as quick as a couple of weeks, or may be protracted
over several months. For a better idea, please contact our office. |
|
 |
|
|
14
We already know what we want, can you just draw it up? |
|
|
|
Many people assume that the solution to dysfunction in their house
planning or the solution to their need for more space is straight
forward. While in some cases, this may be true, there might be
municipal bylaw issues that have not been considered, or “ripple” effects
as a result of proposed changes that do not materialize until
construction.
The
professionals at HEARTH have the experience it takes to help you with
efficient solutions from a planning and space point of view to
construction cost budgeting. We specialize in looking at the big
picture and working to achieving your ultimate goals. |
|
 |
|
|
15
What is a HEARTH
report? |
|
|
|
A HEARTH report is essentially a feasibility study, created with a view
to giving you as much useful information as possible in order to help
you make intelligent decisions about the future of your home.
Please click "Process" above to learn
more about the contents of the report. |
|
 |
|
|
16
How long will my HEARTH report take? |
|
|
|
Your report normally takes 3-5 weeks to complete (including measuring
your existing home in the case of a renovation). However, the timeline
depends on the office’s workload at any given time.
Please contact us
directly for more information about project scheduling. |
|
 |
|
|
17
Why do you need to
measure the house, we already have old plans? |
|
|
|
The
measured drawings, or existing conditions drawings are the foundation
for all future work on your existing house. It is essential that
all of the zoning information is relevant to what has actually been
built and it is essential that any proposed work be related to what
exists. Things almost always change or are adjusted during
construction, and although drawings you may have resemble your home,
discrepancies and differences are built in and lead to false assumptions
and costly errors.
Measuring and drawing the house for a renovation also allows us to get
to know your home intimately and allows us to conduct our analysis and
think about potential problems and solutions even before the "design".
|
|
 |
|
|
18
Can we phase our project? |
|
|
|
Absolutely. In fact often times, it makes sense from an affordability
standpoint. In the HEARTH report we can give you a master plan. That
way, the plan can be broken down into intelligent phases, and having to
redo or tear out recently done work is minimized and future work can be
anticipated in the current construction. |
|
 |
|
|
19
What do you do at a consultation? |
|
|
|
The consultation
is the first step in our architectural service. For more
information on what happens at the consultation or what you must
prepare, please click "Process" above or contact the HEARTH
architectural office. |
|
 |
|
|
20
Why do you charge for a consultation? |
|
|
|
We
strongly believe in the value that design professionals bring to the
table. The cost of the consultation is meant to pay for the architect’s
time and includes any advice that may be
dispensed during the consultation. The AIBC requires that architects
charge for services rendered. |
|
 |
|
|
21
We weren’t anticipating spending so much on professional fees.
How can we work the cost of these fees into project cost? |
|
|
|
As
it is a requirement to fund the design work prior to construction, this
is often a concern. Your best bet is to discuss your needs with your
bank and/or financial advisor. Many products are available these days
to assist people looking to build houses or renovate. |
|
 |
|
|
22
Why do you need to spend so much time (and therefore more fees)
with the blueprints and specifications, can we make decisions on
an as need basis during construction? |
|
|
|
Many construction components have lead times that make on-the-fly
decision making detrimental to the budget and the schedule. Most
importantly, however, we pride ourselves in making as complete a
construction document package as possible.
The
more detail prospective builders have, the more meaningful the bids or
proposed budgets are. Having detailed drawings forces them to be more
accountable to you and allows them to obtain real prices. |
|
 |
|
|
23
Can I do my own interior design? |
|
|
|
A
common misconception in residential construction is the role of the
interior designer. Many people believe it is simply making finishes
selections. This is only part of the job.
Other components of the job include drawing interior elevations and millwork
drawings and coordinating these with the architectural drawings,
figuring out tile layouts and documenting and coordinating these with
finer construction details, working directly with building suppliers to
coordinate everything from door and window trim to narrowing down
selections for cabinet knobs. Finally all of this information is
assembled into a
clear, cohesive package.
Other duties are ensuring furniture and lighting layouts work with the
proposed architectural work and fine coordination with the builder
during construction to ensure all of your finishes are executed
properly.
At HEARTH, we realize the
complexity of the interior designer role and the importance of good
interior design (as opposed to just "good taste") to a successful
project. Because of this, interior design is an integrated part of
our overall service. |
|
 |
|
|
24
What about landscape
design? |
|
|
|
Almost
as important as your house, is how your house relates to the garden and
landscape. A house that is well situated allows you to utilize and
enjoy your property to its fullest extent.
At HEARTH we have
a talented landscape designer who is architecturally trained.
Because of this special mix of abilities, Michelle's work is integrated
into your plans from the beginning and is sensitive to architectural
issues as well as landscape and site issues.
Michelle has
extensive knowledge of local plants and trees and is able to work
closely with sophisticated green thumbed owners, or those with a more
passive interest.
Landscape design to a schematic level is included in our full service,
while full landscape construction drawings and specifications is an
additional, complementary service. |
|
 |
|
|
25
What is included in your fee? |
|
|
|
At
HEARTH architectural our fees beyond the HEARTH report include full
architectural design and documentation services, as well as bidding or
negotiating (with prospective builders), and construction services both
on the site and
in the office.
Also included in our service is full interior design and documentation
and landscape design to a schematic level.
Additional services include full landscape design and documentation
service and interior decorating service (drapes, furniture etc.). Other
additional services include Board of Variance representation and other
special approvals with municipalities or other groups. |
|
 |
|
|
26
What square foot
costs for construction can we expect? |
|
|
|
It
is difficult to give a square foot number for construction that is
meaningful.
Costs vary based on a number of factors. For example your
geographical location (even within an area like Greater Vancouver) can
affect your cost per square foot. Other factors that will
influence costs are the types of finishes you select. The price
point of your appliances, or choices like carpet or hardwood can
dramatically affect your bottom line. Even the way a renovation or
addition is approached during the design stage and whether or not the
planned work is optimized can have a significant impact.
Collaterally affected areas in the home can also skew the cost per
square foot. For example, adding a top storey means doing
structural work on the main floor, and possibly the basement and
foundation. These areas are not nomally included in square foot
calculations.
In
the end, some discovery design work must be completed in order to, at
the very least, establish a scope of work to determine a reasonable
square foot estimate for your project. A HEARTH report gives you
this type of information at an early stage before committing to the
whole project. |
|
 |
|
|
27
A note on the recent
construction market volatility. |
|
|
|
The
past five years have seen unprecedented volatility and incredible
inflationary numbers in construction in Greater Vancouver. In fact
over the past few years we have seen inflation in construction costs
rise at 1-1 1/2% per month, versus 3% per year in years past. At
the present time; however, there is some stability creeping back into
the construction market.
In
any case, this
incredible inflation has been coupled with market spikes in certain
material supply and within individual trades, with the undesirable
effect of increasing construction contingencies from less than 10% to
over 25% in some cases.
Recent world economic events have had effect on construction and
development. Single family home improvement is not immune to these
market forces. As such we have seen a "softening" of prices, but
it remains to be seen in the mid-term what construction price will
continue to do.
At HEARTH architectural we will work in your
interests, not only to prepare you for the costs you will face,
but to help mitigate some of the volatility. Having detailed
documents prepared by our team will be instrumental in preparing the
foundation upon which you enter into a construction contract with a
builder. Furthermore, builders recommended by HEARTH have
delivered good results in the past.
|
|
 |
|
|
28
Should we hold off
on any work and continue to save and do the work at a later
date?
|
|
|
|
For some families
a renovation or new home may not be possible immediately. The question
often asked is, "Should we save now and hold off on the work until
we have more money for the improvements?"
The answer is simple from our point of view. If you are not
comfortable with the estimated costs, do not proceed, or reduce
the scope of work and proceed with caution. However, there is one
caveat in the Greater Vancouver residential construction market.
Because construction costs are so volatile, there are some instances
where construction inflation is still outpacing inflation, the gap
between what a dollar can buy now versus a year from now can be as as
much as 13%.
In this case, value for the dollar is quickly eroded. We would recommend
taking a close look at your finances with a professional and examining
your real needs in terms of improvements to your home. That
process will help shed some light on the conundrum and inform you of
your options. |
|
 |
|
|
29
Can I have a Laneway
House? |
|
|
Laneway housing is
an exciting opportunity, but may not be for everyone.
There are stringent requriements that must be met to qualify,
and there are limitations as to where and how many can be
constructed during the trial period of this new initiative.
For information about the program, please contact out office. |
|
 |
|
|
30
How will the
proposed HST affect my project?
|
|
|
The proposed HST or
Harmonized Sales Tax may affect what you pay for your new home
or renovation. Generally speaking, you already pay PST on
materials and supplies for construction. However, at
present labour, management, and even architectural fees are
exempt. The proposed harmonization will mean an increase
in taxes to items such as these.
Depending on whether you are building a new home or renovating,
you may be eligible for significant rebates.
It is important to know that projects that were not
substantially complete by July 1, 2010 may be subject to HST on
the entire amount. This would hold true for projects in
the design phase and the construction phase. |
|
 |
|
|
32
I heard LiveSmart BC
energy incentives have been discontinued, is this true? |
|
|
Due to economic
conditions the LiveSmart BC program has been discontinued.
If you have not had your energy audit completed before this
August, you will not be able to take advantage of this program.
If your audit was completed before August, you will still have
the 18 months to complete and apply for the rebates.
In spite of the loss of this program, there are still federal
governement incentives in the form of the ecoEnergy rebates. |
|
 |
|
| |
|
Disclaimer: The
content of this Web site contains general information and is
not architectural advice. It may not reflect current
architectural, legal or market developments or changes in
the law. HEARTH architectural Inc. expressly disclaims all
liability for actions taken or not taken based on any or all
the contents of this site (including any e-mails sent to or
from the Firm). Readers are
cautioned not to attempt to solve individual problems on the
basis of information contained herein.
|
|
 |
|
|
 HEARTH feature projects
|
|
client
login |
FAQ home contact |
HEARTH
architectural Inc.
|
102-1587 West 8th Avenue Vancouver BC V6J 1T5
| t
(604) 266-4677 f (604) 266-4679
|
site map
Greater Vancouver Residential Architects
and Home Designers - Custom Homes and Renovations
|